Crossroads in city centre, Philippines with overhead cables hanging from telegraph poles.

Every infrastructure is different. Our standards aren't.

Wherever we work in the world, infrastructure looks different.

What seems complex at first glance is often simply a different system; one that requires time, understanding and careful risk planning.

That’s why we love this photo: a high-density web of overhead cables, layered over the years,  delivering power, data and communication.

Inside the venue, it’s about clarity.

- Connections checked.

- Load calculations checked.

- Power distribution mapped.

- Back-ups tested.

- Fluctuations anticipated.

- Alternative plans in place.

Participants see the stage.

They don’t see the cables, the preparations and the contingency plans. That’s our work.

Region: APAC

Location: Philippines

Meeting: Regional workshop

Duration: Two days

Languages: Four

Participants: 60

Format: Plenary, workshops, breakouts

Share this article:

Want to know more?

Contact us